Any deviation to this regulation to be noticed to the Qatar General Electricity & Water Corporation “KAHRAMAA” by the contractor or consultant. These. Regulations for the Installation of Electrical Wiring – Kahramaa. Views . Qatar General Electricity and Water Corporation – Kahramaa · qa. L O D = Qatar General Electricity & Water Corporation . KAHRAMAA hereby certifies that the WORK under the said CONTRACT has been.

Author: Mekree Zolocage
Country: Spain
Language: English (Spanish)
Genre: Spiritual
Published (Last): 11 August 2013
Pages: 304
PDF File Size: 15.72 Mb
ePub File Size: 3.1 Mb
ISBN: 248-3-91721-538-6
Downloads: 81722
Price: Free* [*Free Regsitration Required]
Uploader: Arashisar

Job Listings

Monitoring the implementation of the strategic plan of the Corporation and evaluating its results and submitting periodic reports thereon. Conservation of water and energy does not imply reduction of usage, rather, focuses on effective consumption by minimizing wastage.

Basic monthly salaries are offered depends on the grade of the position and technical interview rfgulation. Detail drawings of the Fuel System 5.

Preparing reports and responses required by regional and international organisations, associations and authorities with respect to the Corporation’s activities in coordination with the concerned administrative units, and following up their recommendations in coordination with the competent bodies in the State.

Developing the Corporation’s general policy and supervise its implementation. Managing the geographical information system of the electrical network and the databases associated with it.

The week begins on Sunday and ends on Thursday. The Department of Electricity Distribution shall be specialised in the distribution of electrical power, in particular the following: Following up material published in newspapers and the media about the Corporation and competencies thereof, presenting them to the officials and preparing responses thereon.

Preparing the Corporation’s general strategic plan in coordination with concerned administrative units, and taking measures of the adoption thereof.

Improving the electrlcal and taking all measures related to the dealing with customers and responding to their complaints and communications. Supervising the implementation of water projects and ensuring compliance with health procedures and safety systems.

General Directorate of Civil Defense: Proposing plans to develop systems and methods of work and simplifying procedures in coordination with the competent bodies and concerned administrative units. Study temporary license applications and issuing Permit.

New water, electricity rules for fresh projects in Qatar – Qatar News Doha

Preparing studies of the functional structure of the Corporation and providing the necessary proposals for the development of the administrative organisation. The Minister of Finance may appoint one or more auditors for the Corporation who shall have the right to access the Corporation’s books, records and documents at any time, to request any data deemed necessary for the proper regulatioh of their duties, and to check the Corporation’s assets and liabilities.

  LADAKH CROSSROADS OF HIGH ASIA PDF

Monitoring the application of occupational safety and health rules and reducing the risks to the Corporation’s electricity and water facilities, staff regulztion contractors. Adhering to the guidelines can help curb emission of harmful gases from air-conditioning system, while electtrical conserving water. Supervising workers and cleaners and deploying them to the Corporation’s regulatory divisions according to the needs and requirements of work.

Road and Drainage Networks Design Dept: The Department of Planning and Quality shall be specialised in the following: The auditor shall submit to the Minister of Finance a detailed report on the result of the audit of the Corporation’s accounts, including suggestions and recommendations. Operating and maintaining electrical power distribution networks in order to ensure the continuous flow of power.

Determining the extent of the demand for water and eectrical the future plans to ensure the continuity of the water supply to customers. Drafting the annual auditing plan of the administrative units in the Corporation and submitting it to the President for adoption, and preparing reports on the auditing results. Any Application has to be contained the following requirements: Equipping the stores on scientific bases to keep the equipment, machinery and supplies and to discharging of them when needs, electricak the regular manners in classification of items and analysing their movement rates, and following up the classification of non-use items.

Coordination and actions on all site activities. Setting the technical specifications and standards required to be available in the equipment, machinery, supplies and operating kaharmaa.

can any one tell me the requirments to get kahramaa licensed?

Maintaining delivery and distribution networks and customers’ connections. Setting organising rules for cooling work and services, and monitoring their implementation. Preparing the annual report on the Corporation’s programmes and achievements, and submit a report thereon to the Minister at the regulatipn of each fiscal year.

Preparing Specification, Scope of work civil, Tender documents. The Department of Operation and Control shall be specialised in transporting and distributing the water safely and effectively to all subscribers, in particular the following: The President shall represent the Corporation before the courts and in its relations with third parties. Preparing worksheets related to local, regional and international conferences, seminars and meetings, with respect to the Corporation’s activities, in coordination with the competent bodies.

  DANFOSS RA 2980 PDF

Supervising hygiene works in the Corporation’s buildings. Receiving and studying applications for building permits. The Department of Electricity Projects shall be specialised in the following: Ensuring the safe load flow of electricity between power production plants and customers. Leading a range of water desalination technology research programmes.

Receiving the equipment and supplies conformed to the introduced specifications. The Department of Electricity Control shall be specialised in conducting all necessary works for the operation, control, protection and safety of the networks of electricity delivery and distribution, in particular the following: The Minister shall, upon the proposal of the President, issue the necessary decisions and regulations to implement the provisions of this Resolution.

Ensuring the application of a high level of quality in customer service through monitoring the services and activities related to customers. Monitoring elsctrical procedures of appointment, vacations, promotion and other matters relating to personnel affairs, and verifying the commitment to the organising laws, regulations and decisions.

Approved Contractors List 8 Nos. Implementing and monitoring the application of regulatjon related to the works of electricity supply and water connection. Reducing water loss and using the latest equipment to detect leakage.

Determining electrical projects and conducting economic feasibility studies thereon. Monitoring the commitment to the laws, regulations and decisions relating to the Corporation’s activity. Preparing the drafts of the Corporation’s legislative tools and expressing opinions on draft laws referred to it. Lay out regulations, standards and codes of practices which pertain to provision regilation electricity and water supplies to various buildings and establishments as well as review of their implementations.

Financial appropriations allocated by the State. Copy of project contract.