Gypsum boards are applied depending on the substrate in different attachment types. In the thin-bed process on a level surface. With. Plasterboard and prewall W – Plasterboard and prewalls – Details catalog – KNAUF – Manufacturers. Wde – Knauf Metal Stud Partition – Single metal stud frame, Knauf Gips KG denies any liability for applications outside of Germany as this (Wde).

Author: Fauzuru Kagagor
Country: Great Britain
Language: English (Spanish)
Genre: Education
Published (Last): 18 August 2005
Pages: 35
PDF File Size: 19.77 Mb
ePub File Size: 10.91 Mb
ISBN: 549-3-46282-660-4
Downloads: 43593
Price: Free* [*Free Regsitration Required]
Uploader: Voodoomuro

W Gypsum Board Drywall Lining System knaif installed with DC stud and DU channel which are located separate from the wall and with 12,5 mm double layer Gypsum Board and in between mineral wool for fulfilling thermal insulation and fire resistance requirements.

Knauf Wall Lining Systems. Do you have any questions?

Knauf – Wall Lining

WC Cleaneo Drywall Lining System is installed with DC stud fixed from the w6111 sides and DU channel which are located separate from the wall and with single layer Cleaneo according to the required area and single layer 12,5 mm Gypsum Board Double layer where Cleaneo is not applied and in between mineral wool in order to fulfill the knauc sound absorption requirements. WC Cleaneo Drywall Lining System is installed on the existing wall with direct hanger, Ceiling C channel and Ceiling U channel with single layer Cleaneo according to the required area and single layer 12,5 mm Knauf Gypsum Board double layer where Cleaneo is not applied and in between mineral wool in order to fulfill the optimum sound absorption requirements.

  INTRODUCTION TO VLSI DESIGN FABRICIUS PDF

Data Sheet System Description Download W W Gypsum Board Drywall Lining System is installed on the existing wall with knaif hanger, Ceiling C and U channels with single or double layer 12,5 mm Gypsum 6w11 and in between mineral wool in order to fulfill the sound and thermal insulation requirements.

Data Sheet W W Gypsum Board Drywall Lining System is installed with DC stud and DU channel which are located separate from the wall and with 12,5 mm double layer Gypsum Board and in between mineral wool for fulfilling thermal insulation and fire resistance requirements.

W Gypsum Board Drywall Lining System is installed with DC stud and DU channel which are located separate from the wall and with 12,5 mm single layer Knauf Gypsum Kknauf and in between mineral wool for fulfilling thermal insulation and fire resistance requirements.

W Gypsum Board Drywall Lining System is installed on the existing wall with direct hanger, Jnauf C and U channels with single or double layer 12,5 mm Gypsum Board and in between mineral wool in order to fulfill the sound and thermal insulation requirements.

  CHECKLISTE VERANSTALTUNGSPLANUNG PDF

My leaflet Show entire leaflet. Privacy and Cookie Policy.

Data Sheet WC Cleaneo WC Cleaneo Drywall Lining System is installed on the existing wall with direct hanger, Ceiling C channel and Ceiling U channel with single layer Cleaneo according to the required area and single layer 12,5 mm Knauf Gypsum Board double layer where Cleaneo is not applied and in between mineral wool in order to fulfill the optimum sound absorption requirements. This site uses cookies so that we can provide you with the best user experience.

Data Sheet WC Cleaneo WC Cleaneo Drywall Lining System is installed with DC stud fixed from the back sides and DU channel which are located separate from the wall and with single layer Cleaneo according to the required area and single layer 12,5 mm Gypsum Board Double layer where Cleaneo is not applied and in between mineral wool in order to fulfill the optimum sound absorption requirements.

By continuing to browse the site you are agreeing to our use of cookies.