Aca les dejo unos videos tutoriales de Minesight para que Bueno gente aca les dejo algunos manuales de Minesight, Surpac, Vulcan y otros. Map3D User’s Manual. Map3D International Ltd Publisher. Map3D Intenrational Ltd. Email: [email protected] Web: Tel: 1 . English; Español (Colombia). . Contenido de KEYWORDS: MineSight®, mine planning, coal, geological modeling, Open pit, mine design, Vale, Colombia . Manual de evaluación técnico-económica de proyectos mineros de inversión. pp.
| Author: | Disho Kajigor |
| Country: | Uzbekistan |
| Language: | English (Spanish) |
| Genre: | Music |
| Published (Last): | 21 February 2004 |
| Pages: | 299 |
| PDF File Size: | 4.18 Mb |
| ePub File Size: | 13.70 Mb |
| ISBN: | 991-9-22770-229-9 |
| Downloads: | 47785 |
| Price: | Free* [*Free Regsitration Required] |
| Uploader: | Arashijind |
Easily visualise, interpret and report on geological and mining data sets including 3D view integration. The manhal relies on conventional modeling, project configuration, deployment, drilling handling and the creation of the geological and block models that make it possible to reliably determine the exploitable mineral resources of interest.
The study of the theoretical case yielded the following results: Get new and compare results quickly with powerful graphing tools, floating windows, and data filters. In order to create the economic design for the mining phases, it was necessary to define the production objectives for each one of them.
That’s d reason i’m looking for alternatives if available. Publicado por Hardy Sahuanay en A theoretical case study was created to illustrate the procedure that will be followed to model eepaol design Vale Esppaol Las Cuevas mine. An overview of the project is presented along with a theoretical case study beginning with the generation of polygons in sections representing the seams, using the true thickness tool.
Finally, operational pits minrsight designed using the Pit Expansion tool in order to optimally exploit the site and facilitate economic balance throughout the project. I don’t know much about the software, but it appears that it can import shapefiles. Finally, short-term planning was carried out using the Interactive Planner IP tool, which ninesight us to construct 2 phases by generating a polygon with half a bench to represent the solids for each extraction phase.
For qualified universities, education licenses are also available.
Upon finishing the creation of the solids for the seams, we switched from the GMS Grid seam model to the 3DBM 3D block model and started generating economic envelopes using the EP Economic planner tool. Geology The plan view of the predominant structural geology of the area is shown in figure 3.
Rapid analysis and spatial continuity modelling with new Visor V7. In the context of mine planning, the search for a suitable mineral extraction methodology that is more profitable for the mining business has led to the development of practical methodologies. After obtaining the operational pits for each phase, the solids representing the material to mindsight extracted for each phase were generated.
Epsaol, polygons were created in sections.
geomin – Minesight
The production requirements for each period were taken into account during this process. Visor V7 – for continuity analysis and modelling. You could use dropbox, google drive, etc.
Maximisor V6 – for conditional simulation. Post as a guest Name. The values throughout the entire project can also be observed. Therefore, smaller 1-month subperiods were generated and represented with colors in the manusl figure Adding Roads and Benches to a Pit Design. Snowden is thrilled to bring you the new, high power, high productivity, Supervisor V8.
Two projects can be seen: The objective of executing the MSOPIT program Multiphases MultiP is to design the project’s economic phases whilst searching for an optimal sequence for the exploitation of the site that maximizes benefits throughout the project. However, before using the true thickness tool for the seams, a fault that crosses them was digitized as minedight in figure 6.
RINCONCITO MINERO
I was working with such exported files quite a while, it works. For the sequencing of phase 1, regular polygons measuring 20m by 20m were generated inside the representative polygons of the phase 1 solid. Espero que les wn y compartan con sus colegas. To program the sequencing, it is necessary to generate a polygon manusl half a bench for the long-term phases that represent the solid of each extraction phase exactly [10]. Thus, they will not be exploited because their net value is negative.
Analysor V7 – for strategic analysis of geological data. Sign up or log in Sign up using Google. Designed by geologists, for geologists, to solve practical geological issues. The production required for each mining phase istons of coal, and each phase will have an approximate size of 4, tons.
These designs were created using the Pit Expansion tool for each of the phases in which ore extraction will take place throughout the project’s lifecycle, whilst retaining the geotechnical parameters.
RINCONCITO MINERO
We offer both Single and Network Licenses. Additionally, the espol uses production requirements to calculate the project’s lifespan. The following are some of the conclusions arising from this study.
Sign up using Facebook.
It was defined that the phase would span one year of mining. Yes you are right its MineSight by Mintec. Other file formats are less common, hence difficult to handle; however mapinfo can import srg files, not msr as far as I know.
Ventsim products are minesighh mine ventilation simulation packages designed to simulate airflows, pressure and heats and many other types. Supervisor V7 has launched! So by any chance is there an option to export as shapefiles?
